Ruskin Dam Safety Right Abutment Upgrade Stage 1


Owner: BC Hydro

Prime Contractor: Matcon Excavation & Shoring

  • Exploratory drilling/installation of piezometers
  • Clearing, grubbing and excavation/offsite disposal of approx. 60,000m3 from mountainside and Dam abutment
  • Sediment control  & treatment of groundwater & surface water
  • Environmental protection to Stave River & Hayward Lake reservoir
  • Dewatering/wellpoints
  • Bioengineering/landscaping to upper slope
  • Demolition/removal of existing log flume overhanging from Dam to Powerhouse bridge
  • Permanent shotcrete retaining wall c/w tie-back anchors & lock block retaining walls
  • Sheet piling
  • Supply/placement of blanket fill to Dam Abutment c/w HDPE drainage piping
  • Roadwork construction, watermain & storm sewer
  • Supply/Installation of a 2100mm dia. Multi-Plate round structure to Dam abutment
  • Construction of concrete Weir House c/w mechanical/electrical & miscellaneous metals to Dam abutment

Photo Album (under construction)

View all projects

 

 


View full size image:

 

 

 

 

 

 

 

 




Project Location:


Ruskin Dam - Mission, BC

Completion Date: May 2010

Contractual Amount: $ 4,700,000

Final Amount: $ 7,000,000


©2006 Matcon Excavation and Shoring Ltd. •• Website Design by Sleepy Hollow Productions
HomeExcavations and ShoringWet & Dry ShotcreteArchitectural ShotcreteLandfill Facilities & Management
Tie Down AnchorsMini PilesJet GroutingSeismic UpgradesContact InformationSite Map