Jet Grouting
Owner : City Of New Westminster
General Contractor: M2K
Jet Grouting cutoff for containement of contaminated soils
Jet Grouted columns: 120 columns 22 meters deep in cobbly bouldery soil. The jet grouting was carried out in predrilled hole with PVC installed for
verticality control. The grout mix was Water Cement with the addition of pre-hydrayted bentonite.
Worley Parsons (Environmental Designer) was awarded for this project with the 2011 Canadian Urban Institute Brownie Award.
Photo Album
View all projects:
|